{"id":23705,"date":"2020-11-16T11:52:01","date_gmt":"2020-11-16T19:52:01","guid":{"rendered":"https:\/\/www.switch.com\/?p=23705"},"modified":"2024-04-12T11:15:08","modified_gmt":"2024-04-12T18:15:08","slug":"switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings","status":"publish","type":"post","link":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/","title":{"rendered":"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings"},"content":{"rendered":"<p>Groundbreakings signal strong customer demand as first building on campus approaches full capacity<\/p>\n<p>ATLANTA, GA &#8211; <a href=\"https:\/\/www.switch.com\/\" target=\"_blank\" rel=\"noopener\">Switch<\/a> (NYSE: SWCH), the exascale technology infrastructure company, today announced the signing of a global logistics company as the anchor tenant at Switch\u2019s Keep Campus in Atlanta. Following this signing, the first data center at this campus, \u201cATLANTA 1\u201d is 72% committed for client deployments \u2013 including space currently under contract in addition to future expansion options. Given this signing and the ongoing strong demand at the Keep Campus, Switch CEO, Founder and Chairman Rob Roy commenced a \u201cvirtual\u201d groundbreaking for the construction of the second and third data center buildings at the campus.<\/p>\n<p>Initially planned for this past April, Switch\u2019s formal grand opening at the Keep Campus was put on hold due to COVID-19 protocols. However, fueled by robust client demand Switch held the virtual event to celebrate the successful opening and accelerated expansion in Atlanta.<\/p>\n<p>The anchor tenant\u2019s deployment will utilize the majority of the second sector at the ATLANTA 1 facility, contributing contractual annualized revenue of over $6 million, excluding expansion options and usage-based charges for power and telecommunications.<\/p>\n<p>\u201cThe demand for enterprise class exascale infrastructure in the Southeastern U.S. technology market validates our strategic decision to locate our newest PRIME campus in Atlanta,\u201d said Switch CEO, Founder and Chairman Rob Roy. \u201cAccelerating development reflects the strong customer need for our differentiated Tier 5<sup>\u00ae<\/sup> Platinum product offering.\u201d<\/p>\n<p>When the second building comes online in 2022, it will add 50 megawatts (MW) of new capacity, with the next building expected to open the following year, adding another 35 MW of capacity.<\/p>\n<p>\u201cUntil we announced our entrance into the market, a Tier 5<sup>\u00ae<\/sup>, 100 percent renewably powered data center product did not exist in the Southeast,\u201d said Switch EVP of Strategy Adam Kramer. \u201cBy locating in the tax competitive environment like Georgia, Switch is clearly growing technology infrastructure capability in the region.\u201d<\/p>\n<p>At full build-out, the Keep Campus footprint will span more than 1.3 million square feet, with an expected overall investment of $2.5 billion in Georgia including Switch\u2019s owned infrastructure in addition to customer expenditures on hardware and other computing resources. The Keep Campus is the fourth Switch PRIME campus in the United States. Switch\u2019s other PRIME campus locations are in Las Vegas and Tahoe Reno, Nevada and Grand Rapids, Michigan.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-29831 size-large\" src=\"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/Switch_SUPERNEXUS_01-29-1-1024x576.jpeg\" alt=\"\" width=\"1024\" height=\"576\" srcset=\"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/Switch_SUPERNEXUS_01-29-1-980x551.jpeg 980w, https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/Switch_SUPERNEXUS_01-29-1-480x270.jpeg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/p>\n<p>As part of its long-standing commitment to be a leader in sustainability, Switch is also working with Georgia Power to ensure the Keep Campus uses 100 percent green energy from new, local and renewable energy resources.<\/p>\n<p><strong>About Switch<br \/>\n<\/strong><a href=\"https:\/\/www.switch.com\/\" target=\"_blank\" rel=\"noopener\">Switch, Inc.<\/a> (NYSE: SWCH), is the independent global leader in exascale data center ecosystems, edge data center designs, industry-leading telecommunications solutions and next-generation technology innovation. Switch Founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company\u2019s world-renowned data centers and technology solutions.<\/p>\n<p>We innovate to sustainably progress the digital foundation of the connected world with a focus on enterprise-class and emerging hybrid cloud solutions. The Switch PRIMES, located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia are the world\u2019s most powerful exascale data center campus ecosystems with low latency to major U.S. markets. Visit <a href=\"https:\/\/www.switch.com\/\" target=\"_blank\" rel=\"noopener\">switch.com<\/a> for more information or follow us on <a href=\"https:\/\/www.linkedin.com\/company\/128192\/admin\" target=\"_blank\" rel=\"noopener\">LinkedIn<\/a> and <a href=\"https:\/\/twitter.com\/switch\" target=\"_blank\" rel=\"noopener\">Twitter<\/a>.<\/p>\n<p><em>This press release contains forward-looking statements within the meaning of federal securities laws. Forward-looking statements in this press release include, but are not limited to, statements regarding future demand and development. The forward-looking statements in this press release are based on information available to Switch as of the date hereof, and Switch disclaims any obligation to update any forward-looking statements to reflect any change in its expectations or any change in events, conditions, or circumstances on which any such statement is based, except as required by law. For additional information regarding forward-looking statements, please refer to Switch\u2019s Annual Report on Form 10-K for the year ended December 31, 2019 (including information under the caption \u201cRisk Factors\u201d) and other reports filed with the SEC. Switch\u2019s SEC filings are available on the Investors section of Switch\u2019s website at\u00a0<\/em><a href=\"https:\/\/urldefense.proofpoint.com\/v2\/url?u=https-3A__investors.switch.com&amp;d=DwMGaQ&amp;c=fpIeS8RwmHkY2r_dFRL5tQ&amp;r=ydPI2uAV4GIbhSwv1kzIPKeayY40JF0cjZxbLmWftzA&amp;m=sU2M9d3VVQbxuZ3HJgVzlXtOitpb-JSQtB8g3-mn0P4&amp;s=0YHi7RFpXmfyp3WihMz7_Z3PAc4jYZONHOzsbPNhCWk&amp;e=\" target=\"_blank\" rel=\"noopener\"><em>https:\/\/investors.switch.com<\/em><\/a><em>\u00a0and on the SEC\u2019s website at\u00a0<\/em><a href=\"https:\/\/urldefense.proofpoint.com\/v2\/url?u=http-3A__www.sec.gov&amp;d=DwMGaQ&amp;c=fpIeS8RwmHkY2r_dFRL5tQ&amp;r=ydPI2uAV4GIbhSwv1kzIPKeayY40JF0cjZxbLmWftzA&amp;m=sU2M9d3VVQbxuZ3HJgVzlXtOitpb-JSQtB8g3-mn0P4&amp;s=Z6J2ZALmVCGP-A1XOjs7Th5C7qnxwr_y8XTXmOCwVic&amp;e=\" target=\"_blank\" rel=\"noopener\"><em>www.sec.gov<\/em><\/a><em>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Groundbreakings signal strong customer demand as first building on campus approaches full capacity ATLANTA, GA &#8211; Switch (NYSE: SWCH), the exascale technology infrastructure company, today announced the signing of a global logistics company as the anchor tenant at Switch\u2019s Keep Campus in Atlanta. Following this signing, the first data center at this campus, \u201cATLANTA 1\u201d [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29179,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"off","_et_pb_old_content":"Groundbreakings signal strong customer demand as first building on campus approaches full capacity\n\nATLANTA, GA - <a href=\"https:\/\/www.switch.com\/\" target=\"_blank\" rel=\"noopener\">Switch<\/a> (NYSE: SWCH), the exascale technology infrastructure corporation, today announced the signing of a global logistics company as the anchor tenant at Switch\u2019s Keep Campus in Atlanta. Following this signing, the first data center at this campus, \u201cATLANTA 1\u201d is 72% committed for client deployments \u2013 including space currently under contract in addition to future expansion options. Given this signing and the ongoing strong demand at the Keep Campus, Switch CEO, Founder and Chairman Rob Roy commenced a \u201cvirtual\u201d groundbreaking for the construction of the second and third data center buildings at the campus.\n\nInitially planned for this past April, Switch\u2019s formal grand opening at the Keep Campus was put on hold due to COVID-19 protocols. However, fueled by robust client demand Switch held the virtual event to celebrate the successful opening and accelerated expansion in Atlanta.\n\nThe anchor tenant\u2019s deployment will utilize the majority of the second sector at the ATLANTA 1 facility, contributing contractual annualized revenue of over $6 million, excluding expansion options and usage-based charges for power and telecommunications.\n\n\u201cThe demand for enterprise class exascale infrastructure in the Southeastern U.S. technology market validates our strategic decision to locate our newest PRIME campus in Atlanta,\u201d said Switch CEO, Founder and Chairman Rob Roy. \u201cAccelerating development reflects the strong customer need for our differentiated Tier 5<sup>\u00ae<\/sup> Platinum product offering.\u201d\n\nWhen the second building comes online in 2022, it will add 50 megawatts (MW) of new capacity, with the next building expected to open the following year, adding another 35 MW of capacity.\n\n\u201cUntil we announced our entrance into the market, a Tier 5<sup>\u00ae<\/sup>, 100 percent renewably powered data center product did not exist in the Southeast,\u201d said Switch EVP of Strategy Adam Kramer. \u201cBy locating in the tax competitive environment like Georgia, Switch is clearly growing technology infrastructure capability in the region.\u201d\n\nAt full build-out, the Keep Campus footprint will span more than 1.3 million square feet, with an expected overall investment of $2.5 billion in Georgia including Switch\u2019s owned infrastructure in addition to customer expenditures on hardware and other computing resources. The Keep Campus is the fourth Switch PRIME campus in the United States. Switch\u2019s other PRIME campus locations are in Las Vegas and Tahoe Reno, Nevada and Grand Rapids, Michigan.\n\n<img class=\"alignnone size-full wp-image-24104\" style=\"height: auto;\" src=\"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/Switch_SUPERNEXUS_01-29.jpg\" alt=\"\" width=\"3840\" height=\"2160\">\n\nAs part of its long-standing commitment to be a leader in sustainability, Switch is also working with Georgia Power to ensure the Keep Campus uses 100 percent green energy from new, local and renewable energy resources.\n\n<strong>About Switch\n<\/strong><a href=\"https:\/\/www.switch.com\/\" target=\"_blank\" rel=\"noopener\">Switch, Inc.<\/a> (NYSE: SWCH), is the independent global leader in exascale data center ecosystems, edge data center designs, industry-leading telecommunications solutions and next-generation technology innovation. Switch Founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company\u2019s world-renowned data centers and technology solutions.\n\nWe innovate to sustainably progress the digital foundation of the connected world with a focus on enterprise-class and emerging hybrid cloud solutions. The Switch PRIMES, located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia are the world\u2019s most powerful exascale data center campus ecosystems with low latency to major U.S. markets. Visit <a href=\"https:\/\/www.switch.com\/\" target=\"_blank\" rel=\"noopener\">switch.com<\/a> for more information or follow us on <a href=\"https:\/\/www.linkedin.com\/company\/128192\/admin\" target=\"_blank\" rel=\"noopener\">LinkedIn<\/a> and <a href=\"https:\/\/twitter.com\/switch\" target=\"_blank\" rel=\"noopener\">Twitter<\/a>.\n\n&nbsp;\n\n<em>This press release contains forward-looking statements within the meaning of federal securities laws. Forward-looking statements in this press release include, but are not limited to, statements regarding future demand and development. The forward-looking statements in this press release are based on information available to Switch as of the date hereof, and Switch disclaims any obligation to update any forward-looking statements to reflect any change in its expectations or any change in events, conditions, or circumstances on which any such statement is based, except as required by law. For additional information regarding forward-looking statements, please refer to Switch\u2019s Annual Report on Form 10-K for the year ended December 31, 2019 (including information under the caption \u201cRisk Factors\u201d) and other reports filed with the SEC. Switch\u2019s SEC filings are available on the Investors section of Switch\u2019s website at&nbsp;<\/em><a href=\"https:\/\/urldefense.proofpoint.com\/v2\/url?u=https-3A__investors.switch.com&amp;d=DwMGaQ&amp;c=fpIeS8RwmHkY2r_dFRL5tQ&amp;r=ydPI2uAV4GIbhSwv1kzIPKeayY40JF0cjZxbLmWftzA&amp;m=sU2M9d3VVQbxuZ3HJgVzlXtOitpb-JSQtB8g3-mn0P4&amp;s=0YHi7RFpXmfyp3WihMz7_Z3PAc4jYZONHOzsbPNhCWk&amp;e=\" target=\"_blank\" rel=\"noopener\"><em>https:\/\/investors.switch.com<\/em><\/a><em>&nbsp;and on the SEC\u2019s website at&nbsp;<\/em><a href=\"https:\/\/urldefense.proofpoint.com\/v2\/url?u=http-3A__www.sec.gov&amp;d=DwMGaQ&amp;c=fpIeS8RwmHkY2r_dFRL5tQ&amp;r=ydPI2uAV4GIbhSwv1kzIPKeayY40JF0cjZxbLmWftzA&amp;m=sU2M9d3VVQbxuZ3HJgVzlXtOitpb-JSQtB8g3-mn0P4&amp;s=Z6J2ZALmVCGP-A1XOjs7Th5C7qnxwr_y8XTXmOCwVic&amp;e=\" target=\"_blank\" rel=\"noopener\"><em>www.sec.gov<\/em><\/a><em>.<\/em>","_et_gb_content_width":"","footnotes":""},"categories":[136],"tags":[],"class_list":["post-23705","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-release"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings<\/title>\n<meta name=\"description\" content=\"Groundbreakings signal strong customer demand as first building on campus approaches full capacity\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings\" \/>\n<meta property=\"og:description\" content=\"Groundbreakings signal strong customer demand as first building on campus approaches full capacity\" \/>\n<meta property=\"og:site_name\" content=\"Switch\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/facebook.com\/SwitchDataCenters\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-11-16T19:52:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-12T18:15:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/ATL_Groundbreaking_PR_FB.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"dsoto\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings\" \/>\n<meta name=\"twitter:description\" content=\"Groundbreakings signal strong customer demand as first building on campus approaches full capacity\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/ATL_Groundbreaking_PR_FB.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@switch\" \/>\n<meta name=\"twitter:site\" content=\"@switch\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"dsoto\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/\"},\"author\":{\"name\":\"dsoto\",\"@id\":\"https:\\\/\\\/www.switch.com\\\/#\\\/schema\\\/person\\\/91826be645e86c6b12a05d33b4270a72\"},\"headline\":\"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings\",\"datePublished\":\"2020-11-16T19:52:01+00:00\",\"dateModified\":\"2024-04-12T18:15:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/\"},\"wordCount\":715,\"publisher\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.switch.com\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/ATL_Groundbreaking_PR_Large.jpeg\",\"articleSection\":[\"Press Release\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/\",\"url\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/\",\"name\":\"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.switch.com\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/ATL_Groundbreaking_PR_Large.jpeg\",\"datePublished\":\"2020-11-16T19:52:01+00:00\",\"dateModified\":\"2024-04-12T18:15:08+00:00\",\"description\":\"Groundbreakings signal strong customer demand as first building on campus approaches full capacity\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.switch.com\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/ATL_Groundbreaking_PR_Large.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.switch.com\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/ATL_Groundbreaking_PR_Large.jpeg\",\"width\":3840,\"height\":2160},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.switch.com\\\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.switch.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.switch.com\\\/#website\",\"url\":\"https:\\\/\\\/www.switch.com\\\/\",\"name\":\"Switch\",\"description\":\"World-Renowned Data Centers and Technology Solution Ecosystems\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.switch.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.switch.com\\\/#organization\",\"name\":\"Switch\",\"url\":\"https:\\\/\\\/www.switch.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.switch.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.switch.com\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/Switch-Logo-black.png\",\"contentUrl\":\"https:\\\/\\\/www.switch.com\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/Switch-Logo-black.png\",\"width\":1200,\"height\":582,\"caption\":\"Switch\"},\"image\":{\"@id\":\"https:\\\/\\\/www.switch.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"http:\\\/\\\/facebook.com\\\/SwitchDataCenters\\\/\",\"https:\\\/\\\/x.com\\\/switch\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/switch-data-centers\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.switch.com\\\/#\\\/schema\\\/person\\\/91826be645e86c6b12a05d33b4270a72\",\"name\":\"dsoto\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8d00bfd5bb03f367386d0084b62ad7dbde756dcdccec524c09212ba0cc164cad?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8d00bfd5bb03f367386d0084b62ad7dbde756dcdccec524c09212ba0cc164cad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8d00bfd5bb03f367386d0084b62ad7dbde756dcdccec524c09212ba0cc164cad?s=96&d=mm&r=g\",\"caption\":\"dsoto\"},\"sameAs\":[\"https:\\\/\\\/www.switch.com\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings","description":"Groundbreakings signal strong customer demand as first building on campus approaches full capacity","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/","og_locale":"en_US","og_type":"article","og_title":"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings","og_description":"Groundbreakings signal strong customer demand as first building on campus approaches full capacity","og_site_name":"Switch","article_publisher":"http:\/\/facebook.com\/SwitchDataCenters\/","article_published_time":"2020-11-16T19:52:01+00:00","article_modified_time":"2024-04-12T18:15:08+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/ATL_Groundbreaking_PR_FB.jpg","type":"image\/jpeg"}],"author":"dsoto","twitter_card":"summary_large_image","twitter_title":"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings","twitter_description":"Groundbreakings signal strong customer demand as first building on campus approaches full capacity","twitter_image":"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/ATL_Groundbreaking_PR_FB.jpg","twitter_creator":"@switch","twitter_site":"@switch","twitter_misc":{"Written by":"dsoto","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/#article","isPartOf":{"@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/"},"author":{"name":"dsoto","@id":"https:\/\/www.switch.com\/#\/schema\/person\/91826be645e86c6b12a05d33b4270a72"},"headline":"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings","datePublished":"2020-11-16T19:52:01+00:00","dateModified":"2024-04-12T18:15:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/"},"wordCount":715,"publisher":{"@id":"https:\/\/www.switch.com\/#organization"},"image":{"@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/#primaryimage"},"thumbnailUrl":"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/ATL_Groundbreaking_PR_Large.jpeg","articleSection":["Press Release"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/","url":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/","name":"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings","isPartOf":{"@id":"https:\/\/www.switch.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/#primaryimage"},"image":{"@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/#primaryimage"},"thumbnailUrl":"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/ATL_Groundbreaking_PR_Large.jpeg","datePublished":"2020-11-16T19:52:01+00:00","dateModified":"2024-04-12T18:15:08+00:00","description":"Groundbreakings signal strong customer demand as first building on campus approaches full capacity","breadcrumb":{"@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/#primaryimage","url":"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/ATL_Groundbreaking_PR_Large.jpeg","contentUrl":"https:\/\/www.switch.com\/wp-content\/uploads\/2020\/11\/ATL_Groundbreaking_PR_Large.jpeg","width":3840,"height":2160},{"@type":"BreadcrumbList","@id":"https:\/\/www.switch.com\/switch-signs-anchor-tenant-at-the-keep-campus-in-atlanta-and-breaks-ground-on-next-two-buildings\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.switch.com\/"},{"@type":"ListItem","position":2,"name":"Switch Signs Anchor Tenant at The Keep Campus in Atlanta and Breaks Ground on Next Two Buildings"}]},{"@type":"WebSite","@id":"https:\/\/www.switch.com\/#website","url":"https:\/\/www.switch.com\/","name":"Switch","description":"World-Renowned Data Centers and Technology Solution Ecosystems","publisher":{"@id":"https:\/\/www.switch.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.switch.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.switch.com\/#organization","name":"Switch","url":"https:\/\/www.switch.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.switch.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.switch.com\/wp-content\/uploads\/2022\/07\/Switch-Logo-black.png","contentUrl":"https:\/\/www.switch.com\/wp-content\/uploads\/2022\/07\/Switch-Logo-black.png","width":1200,"height":582,"caption":"Switch"},"image":{"@id":"https:\/\/www.switch.com\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/facebook.com\/SwitchDataCenters\/","https:\/\/x.com\/switch","https:\/\/www.linkedin.com\/company\/switch-data-centers\/"]},{"@type":"Person","@id":"https:\/\/www.switch.com\/#\/schema\/person\/91826be645e86c6b12a05d33b4270a72","name":"dsoto","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8d00bfd5bb03f367386d0084b62ad7dbde756dcdccec524c09212ba0cc164cad?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8d00bfd5bb03f367386d0084b62ad7dbde756dcdccec524c09212ba0cc164cad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8d00bfd5bb03f367386d0084b62ad7dbde756dcdccec524c09212ba0cc164cad?s=96&d=mm&r=g","caption":"dsoto"},"sameAs":["https:\/\/www.switch.com"]}]}},"_links":{"self":[{"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/posts\/23705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/comments?post=23705"}],"version-history":[{"count":0,"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/posts\/23705\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/media\/29179"}],"wp:attachment":[{"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/media?parent=23705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/categories?post=23705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.switch.com\/wp-json\/wp\/v2\/tags?post=23705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}